How We Work

Our Process

Six deliberate steps from consultation to final handover. We take the stress out of finishing with single-team accountability, clear written quotes, and meticulous craftsmanship.

Step 01

Consultation

We begin by understanding your vision, design preferences, and functional priorities. Whether we meet in person in Nairobi or connect over a video call for clients living abroad, we review your floor plans and room requirements in detail.

What you get at this step:

  • Documented room-by-room finishing wishlist
  • Preliminary scope review against architectural drawings
  • Scheduled date for on-site technical inspection
Step 02

Site Assessment

Our technical team visits your site to verify actual physical dimensions, inspect masonry alignment, check concrete slab moisture levels, and assess plumbing/electrical provisions before any finishing starts.

What you get at this step:

  • Accurate site measurements and ceiling height checks
  • Substrate readiness report (plaster condition, MEP stub-outs)
  • Technical adjustments to prevent on-site rework
Step 03

Written Quote & Plan

No estimates on the back of an envelope. We deliver a comprehensive, itemized written quotation detailing material grades, brand specifications, and skilled labor. Everything is transparent before work begins.

What you get at this step:

  • Itemized written quote with no hidden material markups
  • Defined finishing schedule and execution plan
  • Formal specification of paints, sanitary ware, and profiles
Step 04

Supply of Materials

Leveraging our hardware and logistics foundation, Daya directly sources and transports all materials to your site. By handling logistics in-house, we eliminate contractor delays and ensure materials match the approved specifications.

What you get at this step:

  • Certified gypsum boards, metal studs, and moisture-resistant boards
  • Genuine architectural paints, primers, and Level 5 skimming compounds
  • Verified sanitary fixtures, brass tapware, and plumbing fittings delivered securely
Step 05

Installation

Our trained personnel execute each finish to exacting standards. Bulkheads are framed square and true, skim coats are sanded smooth under raking light, and sanitary fixtures are pressure-tested without compromise.

What you get at this step:

  • Dedicated in-house craftsmen on every finish
  • Active site protection for floors, glass, and adjacent fixtures
  • Regular photo and video milestone progress updates
Step 06

Handover

We walk through every room with you (or via live video inspection for diaspora clients), scrutinizing every joint, surface, and fitting. We resolve every snag before formal sign-off.

What you get at this step:

  • Joint snag list walkthrough and complete resolution
  • Care and maintenance guidance for your new finishes
  • Formal project sign-off and warranty documentation

Ready to take Step 01?

Send us a message or schedule a consultation. We will discuss your site, measure your spaces, and prepare your written quotation.

Talk directly with our project team.

Call us directly, message on WhatsApp, or send an enquiry to get started.